                     (中船第九设计研究院工程有限公司)

 :在砂性场地中建造船坞时,船坞基玩降水施工对临近的板椎码头的值移有较大的影响,甚至会出!酸被墙的拉移向岸侧移动的现象。结合新加波某新建船厂工程,对船璃基流降水施工进程中板推住移的际监测成果进行分析与研究,并应用 PLAXIS 有限元程序进行数值模拟分析。其计算结来进一步验证了监测结果位移趋势的正确性。

关键词:稻鸡 板树码头 降水 位移

The impact on sheet-pile wharf in sandy foundation due to foundation pit dewatering

MA Yong-ping HUANG Hai-yun

(China Shipbuilding NDRI Engineering Co.,Lid.,)

Abstract:During dry dock construction in sandy site,the dewatering of dock foundation pit affects the displacemen of sheet-pile wharf nearby. It can even appear the phenomenon that the sheet pile wall moves to the shore side. Based on a new shipyard project in Singaporethis paper presents the analysis and rescarch for the results of the sheet pile wall displacement monitoring during the dewatering work, and also presents numerical simulation by the application of finite element program PLAXIS.The result of numerical simulation further verified the correctness of the results of displacement monitoring.

Key words: Dry dock, sheet-pile wharf, dewatering, displacement 

 

2 PLAXIS 模拟计算

2.1计算模型及模型参数

本文分别计算考虑基坑降水和不考虑基坑降水2个模型进行比较。考虑基坑降水的计算模型如图3所示,采用PLAXIS程序进行数值模拟计算,计算模型中材料模型采用排水条件下的摩尔-库伦模型。将基坑开挖、板桩码头施工及开挖等各工况进行模拟计算。土层参数及地下水位选择见表2及表3。不考虑基坑降水模型也采用排水条件下的摩尔-库伦模型,土层参数同表2,板桩码头的剩余水位,按英标 BS6349M中的规定取 1.3m,计算模型见图4。表2

4.jpg 5.jpg

2.2 计算结果

分析 PLAXIS 有限元计算结果可知,考虑基坑降水的模型,当计算工况为码头及基坑均开挖至设计标高,水位为表3中各标高时,计算的板桩墙的最大位移位于板桩墙顶,并且位移为向岸侧移动,向海侧的位移仅发生在开挖面以上一段区域,此模型的位移结果图见图 5。而不考虑基坑降水的模型,计算工况为码头开挖至设计标高,剩余水位为 1.3m,此工况计算的位移结果为正常情况下的位移趋势,最大位移发生在开挖面与拉杆中间部位,模型的位移结果图见图 6

在考虑基坑降水的模型计算时,增加计算了码头开挖至设计标高、坞墙回填、地下水位恢复为正常地下水位(剩余水位为 1.3m)时的工况,此工况的计算板桩墙位移与不考虑基坑降水模型计算的板桩墙位移基本相同。此工况的计算位移结果图见图7。各计算模型的位移结果汇总见表4。 